Each
tank take 90-120 day to build. the Tank complete with metal
chassis, metal track, steel-rimmed road wheel, idler wheel, drive
sprocket, heavy duty suspension, Turret, Gear box, motors, Turret motor,
and all body accessories, such as front fender, side fender, Bosch build
light, Hull machine gun mount, all hatch, spare track, crowbar, hammer,
track tension adjusting wrench, engine starter crank handle, tow cables,
towing clevis, wire cutter, jack rest block, shovel, hand axe, cleaning
rod and spare aerial rod stowage tube, engine deck accessories, Radiator
cooling air outlet, guard deleted, track tension adjusting port cover,
muffler, stowage bins, relocated jack, shackles, ventilator, no key
hole, cupola, fire, main gun extinguisher, aerial post etc, near 100%
made by metal, you just need a 6-8ch R/C, and paint the tank.2009 we got
recoil system as a optional accessories for all Verio metal tank
product.
Tiger II was the most powerful heavy Tank with long-barrelled
88mm gun, could fire both armour-piercing and HE ammunition, it was
completely different with the Tiger I,armour slope like Panther, the
first went into action in the mid of 1944 at Normandy and Eastern Front.
King Tiger was a formidable fighting machine.
If you like this heavy machine email us at
metaltankmodel@yahoo.com
or tankmodel@126.com to
check the waiting time
Tiger II Pz.Kpfw.VI,Sd.Kfz King Tiger
V12 cyl,700hp 60 deg V (Maybach HL230P45 23889cc ohc engine at
rear driving front sprockets thrigh a 8 speed gear box, steering
control by differential, Hydraulic brakes.9 double interleaved
road wheels, Torsion bar suspension. Track width
800mm/600mm.Overall dimensions 10290mmx3760mmx3090mm Weight
68000kg. Armour thickness 80mm front 100mm-185mm.860 Liter in 7
fuel tank, Range on road 120km,off road 80km.Max speed 40km/h.
Nearly 500 been build between 1944-45. Turret with 88mm gun.2 MG.
the most heavy tank at WWII. |